- As a broad UK guide, a management survey of a small unit starts from around £200 to £400; mid-size buildings £400 to £900; large or complex buildings and refurbishment and demolition surveys £900 to several thousand pounds.
- Size, age, construction type, the number of samples needed and the survey type (management versus refurbishment) drive the price.
- Sample analysis is usually charged per sample on top of the survey fee.
- A UKAS-accredited surveying organisation costs a little more and gives you a report that stands up to scrutiny.
Asbestos survey pricing depends on two things: how big and old the building is, and whether the survey needs to be intrusive. A management survey of an occupied office is a different job from a refurbishment survey that has to open up ceilings and floors before a strip-out. Here is what each costs and what to look for in a quote.
Typical costs
| Survey | Indicative fee (guide only) |
|---|---|
| Management survey, small unit (shop, small office) | from around £200 to £400 |
| Management survey, mid-size building | around £400 to £900 |
| Management survey, large or multi-building site | £900+, quoted on inspection |
| Refurbishment and demolition survey | typically higher than a management survey of the same area, plus making-good |
| Sample analysis | charged per sample |
Indicative ranges, not a quote.
What drives the price
- Size and layout. More rooms and areas mean more to inspect.
- Age and construction. Pre-1980s buildings and those with known asbestos-era materials need more sampling.
- Survey type. A refurbishment and demolition survey is intrusive, takes longer and may need the area vacated.
- Samples. Each suspect material sampled is analysed in a laboratory, usually at a per-sample cost.
- Access. Roof voids, risers and plant rooms add time.
What the fee should include
The site survey, sampling of suspect materials, laboratory analysis (or a clear per-sample rate), a report with locations, photographs, material and condition assessments and risk scores, and a plan of the building. The report should be usable as your asbestos register. Our guide to the survey types explains the scope of each.
Get asbestos survey quotes
Compare no-obligation quotes from qualified asbestos surveyors who cover your area.
Why accreditation matters
UKAS accredits asbestos surveying and testing organisations against international standards. An accredited survey costs a little more and is what buyers, lenders, insurers and the HSE expect to see. An unaccredited survey that misses materials leaves you with a false register and the full liability.
Keeping the cost sensible
- Provide plans and any previous survey.
- Commission the right survey type for what you are doing: do not pay for a refurbishment survey if you only need a management survey.
- Price several buildings together.
- Compare quotes on accreditation and sample rates.
Getting quotes
Surveyors need the building type and size, its age, the survey type, whether it is occupied, and the postcode. ComSurv gathers that in about a minute and returns no-obligation quotes from qualified surveyors who cover your area.
Sources & further reading
- HSE HSG264: Asbestos, the survey guide — what a survey involves
- UKAS — accreditation of asbestos surveying and testing organisations
External links open in a new tab. ComSurv is a matching service, not a firm of surveyors, and is not affiliated with these organisations. This article is general information, not legal, surveying or valuation advice; take advice on your specific situation.