Moving Your Business into Commercial Premises: The Checklist Nobody Gives You
Key takeaways
- Read the repairing clause and get a schedule of condition before you sign. Nothing else on this list costs as much if you skip it.
- From the day you occupy, you are the responsible person for fire safety in your space and the employer for its electrical, gas and water safety.
- Employers’ liability insurance is a legal requirement from your first employee, and the lease will name the other cover you must hold and evidence.
- Fit-out consents, food registration and card payment set-up all have lead times. Start them before the keys arrive, not after.
Most guides to starting a business stop at the business plan and the bank account. Then you find a unit, and a second job starts that nobody warned you about. The lease decides what you will pay for years. The day you get the keys, you become legally responsible for the safety of the space you occupy. And between those two moments sit a dozen tasks with their own lead times, several of which can push opening day back by weeks. This guide puts them in the order they actually have to happen.
Why the order matters
There are three windows, and each one punishes a different kind of mistake.
- Before you sign. This is the only point at which you have leverage. Anything you discover about the building now is a negotiating point. Discover it afterwards and it is simply your cost, for the whole term.
- Between signing and opening. Mistakes here cost time. Consents, registrations and deliveries each have a lead time, and the ones you start late set the opening date.
- After you open. Mistakes here cost fines, invalidated insurance and, at the end of the lease, a dilapidations bill. Most are duties that simply were not booked.
The rest of this guide works through those windows in turn. Where a duty deserves its own explanation, we link to it rather than repeat it, so this page stays a checklist you can actually use.
Before you sign: the decisions you cannot undo
Read the repairing clause first. Most commercial leases are full repairing and insuring, which means you keep the premises in repair whatever state you inherited them in. On a unit with a tired roof or a 1990s electrical board, that clause is worth more than the rent. Our guide to FRI leases explains how open-ended it can be.
Get a schedule of condition. A schedule of condition is a photographic and written record of the premises on day one, appended to the lease. It caps your repairing liability at the condition you took on and is the single most effective document a new tenant can commission. It costs a few hundred pounds on a small unit, which is covered in our cost guide, against a lease-end claim that can run to tens of thousands.
Ask the landlord for the paperwork. Before completion you want the EPC, which must be rated E or better for the letting to be lawful under MEES; the asbestos register and management plan for any building built before 2000, which the landlord must hold under regulation 4 of the Control of Asbestos Regulations; the most recent EICR; the gas safety record; and the current fire risk assessment. The full list, and what each one tells you, is in our guide to compliance checks before signing a lease.
Check the lease lets you trade the way you intend. The permitted use clause, the opening hours, the alterations clause and the signage clause all need to match your plan. Check the planning use class too. In England many shop, café, office and clinic uses now sit in the same class, so a change between them needs no planning permission, but a change out of class or a new external sign may. The Planning Portal sets out the rules.
Then negotiate. The RICS Code for Leasing Business Premises sets out what a fair negotiation should cover, from rent-free periods to break clauses. A surveyor earns their fee here. Our guide to lease negotiation covers the clauses that matter.
The week you get the keys
From the moment you occupy, you are the employer in the premises and the responsible person for the space you control. These duties do not wait for opening day. Book them in this order.
- Fire risk assessment. Article 9 of the Fire Safety Order requires one for your demise, recorded in full, before staff move in or at the latest in the first days. Escape routes, signage, extinguishers and emergency lighting follow from it. See whether a fire risk assessment is a legal requirement for you (it almost always is) and how many extinguishers you will need.
- Electrical. If the landlord’s EICR is missing, old or unsatisfactory, book your own before the fit-out starts. Add PAT testing for the equipment you bring in. Who carries the EICR, landlord or tenant, is covered in this guide.
- Gas. Any boiler, water heater or catering equipment in your space needs an annual check by a Gas Safe engineer with the right commercial categories, recorded on a CP17 or, for catering, a CP42. See commercial gas safety.
- Water. A legionella risk assessment is required for any premises with a water system, even a small office with a kitchen and a WC. Our guide to legionella in a small office explains what a proportionate assessment looks like.
- Asbestos. Hand the register to every contractor before they touch the fabric. If there is no register and the building is pre-2000, stop and get a survey.
- The paperwork. Display the health and safety law poster or give each employee the leaflet, and start a compliance file on day one. Our guide to tenant compliance responsibilities goes through each duty in depth.
Insurance the law and the lease make you carry
Two things set what cover you need: the law and the lease.
The law. The moment you take on an employee, employers’ liability insurance is compulsory under the Employers’ Liability (Compulsory Insurance) Act 1969. The certificate must be displayed or made available, and trading without it carries a fine of up to £2,500 for every day you are uninsured.
The lease. The landlord normally insures the building and recovers the premium from you as insurance rent. The lease will then list the cover you must hold yourself and when you must show evidence of it, often at completion and at each renewal. Read the insurance schedule before completion, not after, and have the cover in place from the day the lease starts. You are liable for the empty unit from that day, not from the day you open.
Our guide to the insurance clauses in a commercial lease explains each of them. If you would like a conversation with a specialist business insurance broker, we can introduce you. ComSurv does not advise on cover, so the broker handles the detail with you directly.
Fitting out without breaking the lease
The fit-out is where new tenants most often create a problem that surfaces years later. Four checks before anyone picks up a drill, with the full detail in our guide to the fit-out, licence to alter and sign-off.
Licence to alter. The alterations clause will say which works need the landlord’s written consent. For improvements, section 19 of the Landlord and Tenant Act 1927 says that consent cannot be unreasonably withheld, but the landlord can attach conditions, and the usual one is reinstatement at the end of the term. That is where a chunk of the dilapidations bill comes from. Agree in writing which works you will and will not have to strip out.
Asbestos before intrusive work. In a building built before 2000, any work that disturbs the fabric needs a refurbishment and demolition survey first, under the HSE’s HSG264. The management survey the landlord holds is not enough. Our guide to the refurbishment and demolition survey explains when it applies.
Building regulations. Structural work, new toilets or drainage, changes to fire escape routes and some changes of use need building regulations approval before you start, not sign-off afterwards.
Electrical certification. Any new wiring or circuits must be certified by the contractor on an Electrical Installation Certificate. File it with the EICR. Without it, your next inspection starts from scratch and your insurer may ask questions. Our guide to compliance records covers what to keep.
Photograph the unit before the fit-out begins and again when it finishes. Together with the schedule of condition, those photographs are your evidence at lease end.
Compliance Check
See every duty before it becomes yours
Run the free compliance check on the unit you are taking. Ten questions, and you get the list of what the premises will need, with a quote for each.
Taking payments and getting ready to trade
These are the tasks that most often delay an opening date, because each has a lead time that starts when you apply, not when you need it.
Food businesses must register. If you will handle food in any form, you must register with the local authority at least 28 days before you open. It is free and cannot be refused, but it cannot be rushed either, and the environmental health inspection that follows will ask for the gas record, the fire risk assessment and your food safety system.
Card payments. Our guide to card payments before opening day has the full sequence. Order the card machine early, confirm it works with your till or EPOS and your internet connection, and take a test payment before the first customer arrives. We have partnered with DOJO, the UK’s No.1 payments provider, so you can get a quote as part of the same set-up.
Business rates. Tell the council you have moved in and check whether you qualify for small business rate relief, which can remove the bill entirely on a small unit. Relief is not applied automatically.
Waste. A business cannot use household collections. You need a commercial waste contract and transfer notes for everything that leaves the premises, under the duty of care.
Your first year: what comes round again
Compliance is not a one-off. Most of the duties above have a review date, and the first year is when new businesses let them lapse because nobody wrote them down.
- The fire risk assessment must be reviewed whenever the premises or the way you use them change, which in a first year is often.
- Extinguishers need an annual service. Emergency lighting needs monthly function tests and an annual full test.
- The EICR interval is set by the inspector and is typically up to five years. PAT testing is risk-based, so a busy kitchen tests more often than a quiet office.
- Gas appliances need an annual check. The legionella assessment needs a review at least every two years or on any change to the system.
- The EPC lasts ten years, but it becomes your problem at renewal if the rating sits on the E boundary.
Every interval is in one place in our compliance calendar. Keep the certificates together, because the people who will ask for them are your insurer at renewal, the environmental health officer, the fire service, and your landlord at lease end. Our guide to what happens when a property is not compliant shows what each gap can cost.
What catches each trade out
The duties above apply to every business. These are the ones that catch each trade out in practice.
- Café or restaurant. Food registration 28 days ahead, a CP42 gas record for the kitchen, extraction and fire suppression in the fire risk assessment, and a card machine that works on a busy Saturday.
- Shop. The fire risk assessment for a public space, PAT on every plugged-in display, and the lease clause on shopfront alterations and signage.
- Salon, barber or clinic. Legionella in the backwash units and showers, the electrical load of the equipment you bring in, and treatment liability cover named in the lease.
- Office. The quiet one. Legionella in the kitchen and WCs, PAT on laptops and chargers, and the reinstatement clause on partitions you put up.
- Gym or studio. Occupancy limits in the fire risk assessment, legionella in the showers, and the structural load of the equipment on the floor.
- Workshop or industrial unit. Asbestos in the roof and walls, a fixed-wire inspection on three-phase supplies, and F-gas rules on any air conditioning over 12kW.
Each trade has its own detailed guide, linked above. Three more cover the tasks every trade shares: card payments before opening day, the fit-out and licence to alter, and what the lease’s insurance clauses require. The free compliance check covers all six trades.
Check the unit before it is yours
The free compliance check works on a building you are about to take as well as one you already occupy. Answer ten questions about the premises and you get the list of duties that will be yours, with a quote for each from a provider who covers your area. Use it before you sign, and you walk into the negotiation knowing what the building needs. Use it after, and you have the first year’s bookings in one place.
Sources & further reading
- RICS: Code for Leasing Business Premises what a fair lease negotiation should cover
- GOV.UK: non-domestic minimum energy efficiency standard the E rating a unit needs to be let to you
- Regulatory Reform (Fire Safety) Order 2005, article 9 the fire risk assessment duty on the responsible person
- Control of Asbestos Regulations 2012, regulation 4 the duty to manage asbestos in non-domestic premises
- HSE: HSG264, Asbestos: the survey guide the refurbishment and demolition survey before intrusive works
- GOV.UK: employers’ liability insurance the compulsory cover and the daily fine for trading without it
- Landlord and Tenant Act 1927, section 19 consent to improvements not to be unreasonably withheld
- GOV.UK: building regulations approval the works that need approval before you start
- GOV.UK: register a food business at least 28 days before you open
- HSE: the health and safety law poster what every employer must display or hand out
Questions
Frequently asked questions
What do I legally need before opening a business in commercial premises?
A recorded fire risk assessment for the space you occupy, a safe electrical installation with an EICR, an annual gas safety check if there are gas appliances, a legionella risk assessment, employers’ liability insurance from your first employee, and, for any food business, registration with the local authority at least 28 days before opening. The lease will add its own requirements for insurance and alterations.
Do I need a survey before signing a commercial lease?
You need a schedule of condition. It records the state of the premises on day one and caps your repairing liability at that state under a full repairing lease. A building survey is worth adding on an older or larger unit, or where you will be responsible for the roof or plant.
Who is responsible for fire safety when I rent a shop or unit?
You are, for the space you control, from the day you occupy it. Under the Regulatory Reform (Fire Safety) Order 2005 the tenant is the responsible person for its demise. The landlord usually remains responsible for the common parts and the building’s shared fire systems.
Is employers’ liability insurance compulsory for a new business?
Yes, from the moment you employ anyone, under the Employers’ Liability (Compulsory Insurance) Act 1969. You must display or make available the certificate, and the fine for trading without cover is up to £2,500 for every day you are uninsured.
How far ahead do I need to register a food business?
At least 28 days before you open. Registration with the local authority is free and cannot be refused, but the environmental health inspection that follows will expect to see the gas safety record, the fire risk assessment and your food safety management system.
Can my landlord stop me fitting out the unit?
The alterations clause in the lease decides which works need consent. For improvements, section 19 of the Landlord and Tenant Act 1927 says consent cannot be unreasonably withheld, but the landlord can attach conditions, usually that you reinstate the unit at the end of the term. Agree the reinstatement position in writing before the work starts.