Taking Your First Office Lease: The Premises Checklist

1 December 2026 · 7 min read

Key takeaways

  • The reinstatement clause decides what you strip out at lease end. Agree it in writing before the partitions and cabling go in.
  • In a multi-let building you are the responsible person for your floor. The landlord’s assessment covers the common parts, not your demise.
  • A kitchen and a WC are a water system. A proportionate legionella assessment is required even in a small office.
  • Laptops, chargers and monitors are portable appliances. The HSE does not require annual testing, but it does require a risk-based regime.

An office is the easiest commercial unit to take and the easiest to underestimate. There is no kitchen gas, no public walking in, no heavy plant on the floor. So new tenants sign, move the desks in and assume compliance is someone else’s problem. The duties are smaller than a restaurant’s, but they are yours, and the lease clause that costs most is the one about the partitions you are about to put up. This guide is the office version of our main checklist.

Before you sign: the clauses that cost most in an office

Our main checklist and our guide to compliance before signing a lease cover the paperwork to ask for. In an office lease, four clauses deserve more attention than any certificate.

Reinstatement. Nearly every office fit-out adds partitions, a meeting room, data cabling and a kitchen. The alterations clause will usually require the landlord’s consent, which under section 19 of the Landlord and Tenant Act 1927 cannot be unreasonably withheld for improvements, but can be conditioned on stripping everything out at the end. That strip-out is the office tenant’s dilapidations bill. Agree in writing, before the works, which items you will reinstate and which can stay.

Break clause conditions. A break that depends on vacant possession, all rent paid and no breach of covenant can be lost over an unpaid service charge or a partition still standing. Read the conditions, and diarise the notice date the day you complete.

Security of tenure. Under section 24 of the Landlord and Tenant Act 1954, a business tenant usually has the right to renew. Most office leases are contracted out of that protection under section 38A, which means the landlord can take the office back at the end of the term. You will sign a declaration to that effect. Know which kind of lease you are taking.

Repair and the schedule of condition. On a floor of an older building, the repairing clause can make you responsible for a ceiling, windows and services you have never seen behind. A schedule of condition caps that at the state you took on. The RICS leasing code sets out what the heads of terms should say on all four points.

Fire safety on a floor you share

Most first offices are a floor or a suite in a multi-let building. That splits the fire duty in two. The landlord is the responsible person for the common parts, the stairs, the alarm panel and the building’s escape strategy. You are the responsible person for your demise under article 9 of the Fire Safety Order, and you need your own recorded fire risk assessment before staff move in.

Ask the landlord for the building assessment and read the two together. The common failures in an office are a fire door wedged open, a partition that blocks a route the building plan relies on, and a kitchen appliance nobody put on the assessment. Our guide to fire risk assessments in multi-let buildings explains where the boundary sits, and how many extinguishers a business needs gives the method for your floor.

Water: the kitchen and the WCs

An office with a kitchen tap, a water heater and a WC has a water system, and the HSE’s approved code of practice L8 requires the risk from legionella to be assessed. For a small office the answer is usually short: a mains-fed cold supply, a small point-of-use heater and a few outlets, with the main risk being a tap or shower that nobody uses. The assessment is still required in writing, and so is a simple log. Our guide to legionella in a small office sets out what proportionate looks like, and what changes if the building has a shared tank or a shower.

Electrical: the installation and the things on every desk

Ask for the landlord’s EICR for your floor before completion. If the building has one covering the landlord’s installation only, your demise may never have been tested. Get it done before the desks arrive, and have every new circuit the fit-out adds certified on an Electrical Installation Certificate. Who carries the duty between landlord and tenant is covered in this guide.

Then the desks. Laptops, chargers, monitors, a printer, the kettle and the microwave are all portable appliances. The HSE’s PAT FAQ is clear that annual testing is not a legal requirement for low-risk office equipment, but a risk-based regime is, which usually means a visual check and a test before equipment goes into use and longer intervals afterwards. Our guide to PAT testing for offices and IT equipment sets the intervals for each category.

Each screen user also needs a workstation assessment under the display screen equipment rules. The HSE’s guidance includes a self-assessment checklist you can use on day one.

Compliance Check

See what the office will need before you sign

Run the free compliance check on the office you are taking. Ten questions, and you get the list of duties that will be yours, with a quote for each.

Start the free check

The workplace rules that come with the floor

The Workplace (Health, Safety and Welfare) Regulations 1992, with the HSE’s code of practice L24, set the baseline for any office: a reasonable temperature, enough space per person, adequate lighting and ventilation, drinking water, enough WCs for the headcount, and somewhere to eat. Most of these are decided by the building you choose, so check them on the viewing, not after completion. The two that catch new tenants are headcount against WCs, when a small suite is filled with more desks than it was designed for, and ventilation in a sealed floor where the landlord’s system is not running out of hours.

Fit-out: partitions, cabling and air conditioning

Three things in an office fit-out need thought before the contractor starts.

  • Partitions. They change the fire escape plan and the ventilation, and they are the first thing on the reinstatement list. Get the landlord’s consent with the reinstatement position agreed, and update the fire risk assessment when they are up.
  • Cabling. Data cabling through ceilings and risers often crosses the landlord’s retained parts and may need a wayleave for the provider. In a building built before 2000, the ceiling void may contain asbestos, so hand the register to the cabling contractor and get a refurbishment survey if the work disturbs the fabric.
  • Air conditioning. If your floor has its own system, you inherit its duties: a TM44 inspection where the total output passes the 12kW threshold, and F-gas leak checks on larger systems. Ask who services it and when it was last inspected.

Photograph the floor before and after the fit-out and keep the consents with the lease. Together with the schedule of condition they are your evidence at lease end.

Year one: what comes round again

  • Fire risk assessment: reviewed when the layout or headcount changes. Extinguishers: annual service. Emergency lighting: monthly function test.
  • Legionella: outlets flushed weekly if unused, assessment reviewed at least every two years.
  • PAT: risk-based, with the longest intervals for fixed IT and shorter ones for the kitchen.
  • EICR: at the interval the inspector recommends, typically up to five years for an office.
  • Air conditioning: TM44 every five years where it applies, F-gas checks at the interval the system size sets.
  • Employers’ liability insurance: renewed annually and the certificate displayed or available.

Every interval is in our compliance calendar, and the free compliance check gives you the list for your floor with a quote against each line.

Sources & further reading

Questions

Frequently asked questions

Do I need a fire risk assessment for a small office?

Yes. Under the Regulatory Reform (Fire Safety) Order 2005 the person in control of the premises must carry out a fire risk assessment, and in a multi-let building that means you for your own floor or suite. The landlord’s assessment covers the common parts only. It must be recorded, and it must be in place before staff move in.

Does a small office need a legionella risk assessment?

Yes, if it has any water system, which includes a kitchen tap, a water heater and a WC. For a small mains-fed office the assessment is short and inexpensive, but it must be written down and reviewed, with a simple log of flushing for any outlet that goes unused.

Is PAT testing a legal requirement for office equipment?

The law requires electrical equipment to be maintained in a safe condition. It does not set an interval, and the HSE says annual testing is not necessary for low-risk office equipment. A risk-based regime, with a check before equipment goes into use and longer intervals for fixed IT, is what you need to show.

What is a reinstatement clause in an office lease?

It is the condition the landlord attaches to consent for your fit-out, requiring you to remove partitions, cabling and other alterations and return the office to its original state at the end of the term. It is the main source of an office tenant’s dilapidations bill, so agree which items must be reinstated before the works start.

What does it mean if an office lease is contracted out of the 1954 Act?

Business tenants normally have a statutory right to renew under the Landlord and Tenant Act 1954. A contracted-out lease removes that right, so the landlord can take the office back at the end of the term. You will sign a declaration confirming you understand this before the lease is granted.

Who is responsible for the EICR in a rented office?

The landlord is usually responsible for the installation in the common parts and up to your meter, and the tenant for the installation within the demise. If the landlord’s EICR covers the building only, your floor may never have been tested. Commission one before the fit-out and keep it with the lease.